1. Home
  2. Blog
  3. Selling the car deck by the lane-metre
Blog · Operations

Selling the car deck by the lane-metre

A car deck does not fill up by the number of vehicles on it. It fills up by length and weight. BORA books, prices and loads vehicles in the units they actually consume, so a full deck is genuinely full and an oversize vehicle is caught before the ramp.

All articles
Published15 October 2026
SectionOperations
Reading3 min
CoversVehicles · Car-deck pricing · Vehicle gate

BORA Systems is a ferry operations platform built in Tallinn, Estonia — 33 modules across 6 functional categories, each on its own microservice with a local API. Certified to ISO/IEC 27001 and GDPR-compliant. As of 2026, in daily service across three regions: the Baltic, the Channel Islands and the Persian Gulf.

Why measure a car deck in lane-metres?

Counting vehicles treats a hatchback and an articulated lorry as the same thing. A deck booked by headcount looks full when it is half empty, or looks half empty until the third lorry arrives at the gate.

In BORA's Vehicles module each deck is described per vessel in lane-metres, weight limit and slots. A vehicle booking is measured against that real capacity: it consumes lane-metres and weight, not just a place in a count. Remaining car-deck capacity reflects what has actually driven aboard.

How does lane-metre pricing work?

BORA's Car-deck pricing sets the rate a vehicle pays by class, length, route and season, against the lane-metres it consumes. A lorry and a car on the same deck pay for what they actually take, rather than a flat per-vehicle fare.

A rule change applies forward to new sales; vehicle tickets already issued keep their price.

What happens when the vehicle arrives at the terminal?

The vehicle gate reads the vehicle as it arrives. ANPR cameras read the plate and match it to the booking, or take a walk-up and price it on the spot. The vehicle is measured against the deck limits, assigned to a deck that can take it, and the correct lane opens — with no marshal directing traffic at the barrier.

An oversize vehicle is caught at the gate, not discovered on the ramp, and the measurement feeds straight back into capacity: the deck plan the crew works from reflects what has actually driven aboard, not what was booked in the abstract.

Where does freight fit in?

Freight shares the same deck and the same ledger. In Cargo / Freight a consignment is booked on a paperless consignment form, measured against deck capacity, priced, and manifested alongside every passenger and vehicle on the sailing, so a mixed sailing is one picture rather than a freight spreadsheet reconciled against a passenger system.

If a vessel is reconfigured — a deck closed, a cabin block withdrawn — the change is made once in Vessels and reaches capacity, pricing and boarding at once.

Who sells their decks this way?

Tuule Liinid connects the Estonian mainland to its western islands on short, weather-exposed crossings. Its vehicle decks are booked to the metre and measured at the gate against the deck plan, across 18 scheduled sailings a day on 3 routes and more than 120,000 vehicles a year.

On the Saaremaa routes, seasonal demand means vehicle decks have to be planned to capacity: 10 crossings a day in peak season, with 4 vessels in the fleet.

Blue Wave Corporation, which operates a 589-ft cargo Ro-Pax ferry in Panama with 1,925 lane-metres of freight vehicles, ran its sales, boarding and reporting on BORA.

What does the vehicle gate not do?

It measures for deck assignment, not for a legal weighbridge certificate, and it does not weigh hazardous or special cargo to regulatory standard. Cargo / Freight books and manifests a load; it does not certify dangerous-goods handling.

It also does not override a manual hold: a vehicle flagged for inspection still stops for a person. The gate automates the standard case, not every case.

See BORA on live data

A 30-minute walkthrough, from a web booking to the ramp closing.

Head office

Akadeemia tee 15a, 12618 Tallinn, Estonia

Request a demo

See it on live data — a 30-minute walkthrough, from a web booking to the ramp closing.